Sitemap
Pages
Posts by category
- Category: MRI News
- Yet Another, This Time Northolt Leisure Centre
- Installing Various Plant into Slough Data Centre
- ACTON LEISURE CENTRE
- Hovering a Generator through a hole in the wall
- Return to Luton Hospital
- We Use Muscles Too
- Glass Units at Covent Garden
- It’s not just the heavy it’s the awkward too!
- Another small tunnel to get through for an emergency job
- Large or small MRI are there to help
- Hot time at Luton Hospital
- It can’t be done, MRI prove it can!
- Transported from Hastings to Dagenham
- Stripping out Steel Tube Boilers
- Movement of some cabins
- Tube Boilers in Canary Wharf
- Removal of a redundant Calorifier
- Storage options with MRI
- Storage of 5 large Chillers
- Replacement of AHU’s
- Manoeuvring PDU Panels into Plantroom.
- Replacing Chillers at roof level
- Crane Lorry Lifting Portacabins
- MRI’s Crane Lorry Lifting Plant from the rear of a delivery vehicle.
- Plant Movements at a Data Centre near Slough
- Boiler Plant Installation at Aylesbury
- CHP Movement
- 2022 Accreditations
- FORS Silver
- Air Cooled Chiller Replacement
- New crane mats have just arrived
- Just delivered..! A Manitou MT 1135 telehandler forklift truck.
- MRI replace chillers with new, at a major data centre in North London
- Large lift at major new development at Kings Cross
Portfolio
- Westfield Avenue, Stratford
- Odeon Greenwich
- Barclays Bank – Canary Wharf
- Premier Place
- Cineworld Plymouth
Avada Slides
Testimonials
- Highest Praise Ever!
- Equinix LD8 Plant Replacement Crane Lift
- Equinix Chiller Replacement
- Whitelands House, Cheltenham Terrace
- Premier Inn, Hendon
- Stamford Brook
- Whitelands House, Cheltenham Terrace
- Lifting of Pit Lids at Gyron
- Northolt Data Centre, Phase 2 Chiller Crane Lift
- Removal of water tanks at Gyron
- Steve
- Mark and Mike